|
DELIVERABLE
|
ACTION
|
|
Minutes of the 1st meeting of Consultation Committee
|
C 4
|
|
Patrol program
|
C 4
|
|
Report on current situation on bird crime
|
C 4
|
|
Project management guidelines
|
F 1
|
|
Project progress monitoring protocol
|
F 1
|
|
Composite technical report with the specifications of Actions C.1 and C.2
|
A 1
|
|
Preliminary study on monitoring socioeconomic aspects and ecosystem functions
|
D 2
|
|
Project’s Conservation Monitoring Protocol
|
D 1
|
|
Three maps with the locations of Actions C
|
A 1
|
|
Two maps with the distribution of alien plant species (C.3)
|
A 1
|
|
Minutes of the 1st meeting of Scientific Committee
|
F 2
|
|
Publication of 1st Article on the project
|
E 1
|
|
Preparation of the first draft management plan for Koshi site
|
A 2
|
|
Report on Communication Strategy
|
C 4
|
|
Environmental Impact Assessments
|
A 1
|
|
Minutes of the 2nd meeting of Consultation Committee
|
C 4
|
|
Technical study for the weir
|
A 1
|
|
Deliver of an approved management plan for Koshi site
|
A 2
|
|
Production of TV spot on birds (Video1 ) (Video2)
|
E 1
|
|
Technical Report on the population sizes assessment
|
A 3
|
|
Minutes of the 2nd meeting of Scientific Committee
|
F 2
|
|
Minutes of the 3rd meeting of Consultation Committee
|
C 4
|
|
Preparation and distribution of printed material (Leaflets and Posters) (Leaf. 1) (Leaf. 2) (Leaf. 3) (Posters)
|
E 1
|
|
First Newsletter of the project
|
E 1
|
|
Power point presentation on birds for schools
|
E 1
|
|
Minutes of the 3rd meeting of Scientific Committee
|
F 2
|
|
Publication of Article no. 2 on the project
|
E 1
|
|
Action Plan on bird crime
|
C 4
|
|
Minutes of the 4th meeting of Consultation Committee
|
C 4
|
|
Report on the 1st visit of networking with LIFE projects
|
F 3
|
|
Deliver of a documentary on birds (Video)
|
E 1
|
|
Minutes of the 5th meeting of Consultation Committee
|
C 4
|
|
Power point presentation on birds for schools
|
E 1
|
|
Minutes of the 4th meeting of Scientific Committee
|
F 2
|
|
Publication of Article no. 3 on the project
|
E 1
|
|
Minutes of the 6th meeting of Consultation Committee
|
C 4
|
|
Report on the 2nd visit of networking with LIFE projects
|
F 3
|
|
Second Newsletter of the project
|
E 1
|
|
Final report on bird crime
|
C 4
|
|
Layman’s report
|
E 3
|
|
Proceedings of the expert’s workshop in Cyprus
|
F 3
|
|
After LIFE conservation plan
|
F 4
|
|
Final study on socioeconomic aspects and ecosystem functions (with Final Report)
|
D 2
|
|
Minutes of the last meeting of Consultation Committee
|
C 4
|